Date Posted:Nov 18, 2025 8:25 am , By: Jeff Lum 0 |
![]() |
Date Posted: Jan 29, 2026 2:57 pm , By: Kathryn Troyan
, Rating: Note
BUS install scheduled 2/2 (same day as PV), customer notified Using Henkels convenience service, unless they arrive too late in the day - bring BUS for pre-wire in case it's needed. |
![]() |
Date Posted: Jan 26, 2026 10:01 am , By: Kathryn Troyan
, Rating: Note
Requested BUS install from Henkels |
Date Posted: Jan 14, 2026 11:51 am , By: Wei Lun Lian
, Rating: Urgent
Metal standing seam
Need siemens gen panel & gutter |
|
|
|
|
Installation Dates & Technicians
Customer Details
|
System Specifications
Roof & Racking
Electrical
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Notes
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|||||
| JOB DETAILS | |||||
|---|---|---|---|---|---|
| Job Installation Date | February,02 2026 | ||||
| Customer Name | Marshall Ito | ||||
| Sales Consultant Name | Jeff Lum | ||||
| Geographical Location | [WED] - Waimanalo - Kaneohe - Kailua - Kaawa - Laie | ||||
| Address | 565 Paopua Lp,Kailua, 96734 | ||||
| Roof Type | Metal Roof - Standing Sea | ||||
| System Size | 4.4 kW | ||||
| Assigned Technicians | Matthew Edboi,Wesley Perbera,Ian Tsukiyama,Jesse Gomez,Rodnick Agpalza | ||||
| Assigned Electriciaan | |||||
| PARTS LIST | Quantity | Unit | QTY pulled | Addtl QTY pulled | QTY returned |
| Hyundai 440NF Black | 10 | pcs | |||
| Tesla 11.5 kWh | 1 | pcs | |||
| Rapid Shutdown | 4 | pcs | |||
| Engineering | 1 | pcs | |||
| IronRidge Bonded L-Foot Black | 14 | 20 pk | |||
| IronRidge UFO Module Clamp Black | 20 | 20 pk | |||
| IronRidge UFO 46MM Stopper Black | 10 | 20 pk | |||
| WEEB-6.7-1, assembled Ground Lug | 5 | pcs | |||
| Iron Ridge XR-100-204B XR100 Rail 204" Black (17') | 84 | pcs | |||
| Iron Ridge XR-100-SPLC XR 100 Splice Mill | 2 | ft | |||
| Iron Ridge XR-100-CAP XR100 End Cap 10 PC Kit | 10 | pcs | |||
| Iron Ridge RS-GDST-001 GROUND STRAP | 2 | pcs | |||
| S5 Clips | 31 | pcs | |||
| Ground Wire per foot | 42 | ft | |||
| Zip Ties Large | 42 | pcs | |||
| Zip Ties Small | 30 | pcs | |||
| Monier, Metal, Wood Shake or >24 panels | 1 | pcs | |||
| Total Roof Labor | 10 | labor | |||
| Roof Labor | 10 | labor | |||
| AEI Site Assesment | 2 | sub | |||
| Electrical Materials | 1010 | units | |||
| Electrician-Journeyman | 66 | labor | |||
| Electrician-Helper | 50 | labor | |||
| sticker | 1 | ||||
| NEM+ Generation Panel | 1 | ||||
| Hardwire | 1 | ||||
| Permit Fee | 381 | ||||
| Tesla Powerwall 3 AC (14.0 kWh) | 1 | pcs | |||
| Tesla PW2 AC (14.0 kW) & Gateway | 1 | pcs | |||
| Shipping | 1 | ea | |||
| Electric Material Storage | 485 | unit | |||
| Electrician-Journeyman | 10 | labour | |||
| Electrician-Helper | 10 | labour | |||
| ELECTRICAL PARTS & LABOR TOTAL | 20 | labour | |||
| Check or CC Price | 1 | 1.03 | |||
| Solar Insure Storage | 1620 | ||||
| Solar Insure PV | 440 | ||||