PV System Details / Marshall Ito / Kailua

Date Exported: Feb 21,2026,06:51 PM, jobID 108013 , Page 1 of 2

Comments
Site Survey & PV Design Comments
Date Posted: Dec 04, 2025 11:45 am , By: Vince Guting , Rating: Note PM email

No email notes
Date Posted: Nov 18, 2025 8:28 am , By: Jeff Lum , Rating: Semi-urgent Customer prefers an afternoon PM. Can do?
Installation (Roof & Electrical) Comments
Date Posted:Nov 18, 2025 8:25 am , By: Jeff Lum 0
Date Posted: Jan 29, 2026 2:57 pm , By: Kathryn Troyan , Rating: Note BUS install scheduled 2/2 (same day as PV), customer notified
Using Henkels convenience service, unless they arrive too late in the day - bring BUS for pre-wire in case it's needed.
Date Posted: Jan 26, 2026 10:01 am , By: Kathryn Troyan , Rating: Note Requested BUS install from Henkels
Date Posted: Jan 14, 2026 11:51 am , By: Wei Lun Lian , Rating: Urgent Metal standing seam 
Need siemens gen panel & gutter
Administrative & Accounting Comments
Date Posted: Jan 07, 2026 2:24 pm , By: Kathryn Troyan , Rating: Note HECO - PE SL
Date Posted: Dec 10, 2025 2:51 pm , By: Kathryn Troyan , Rating: Note HECO - NEM+ Application Submitted

Preliminary designs sent
Date Posted: Dec 04, 2025 8:48 am , By: Rad Nakamura , Rating: Note Solar Insure SI-30 Total
Customer Experience Support comment
Date Posted: Feb 03, 2026 8:41 am , By: Chris Schopen , Rating: Note Install complete. 1 line matches install. Send IR
Date Posted: Feb 02, 2026 7:09 pm , By: Matthew Edboi , Rating: Note Roof pau pic sent. 
Design & Engineering
Date Posted: Feb 03, 2026 8:44 am , By: Kiana Moku , Rating: Note SENDING FOR FINAL PAYMENT - $14,843

SENT TO han.sourou@gmail.com
DUE DATE 02/13/2026
Date Posted: Jan 30, 2026 12:51 pm , By: Ginger Decosta , Rating: Note
called spoke w/Marshall (808) 554-9862
and confirmed 2/2/26 install 
Date Posted: Jan 27, 2026 3:11 pm , By: Kathryn Troyan , Rating: Note Sent PV design to homeowner for upcoming install
Date Posted: Jan 26, 2026 1:45 pm , By: Kiana Moku , Rating: Note RCVD PAYMENT - CHECK 1749  - $17,000
REMAINING BALANCE - $14,863.00
Date Posted: Jan 26, 2026 1:44 pm , By: Kiana Moku , Rating: Note REVISED PA RCVD - 01/23/2026
METHOD OF PAYMENT - CHECK 

REMAINING BALANCE - $31.863 
SENT FOR 50% PAYMENT TO han.sourou@gmail.com 
Date Posted: Dec 03, 2025 7:37 am , By: Kathryn Troyan , Rating: Note HOA: None
Permit: Online
Date Posted: Nov 21, 2025 1:13 pm , By: Karen Yokota , Rating: Note Rec'd deposit check #750 for $1,500.00.

PV System Details /Marshall Ito / Kailua

Date Exported: Feb 21,2026,06:51 PM ,jobID 108013 , Page 2 of 2

Installation Dates & Technicians
Job Type: Standard System
Premeasure Date (PM): Wed,Nov 26,2025
Elec. Service Date (EL):
Pre-lagging Date (PL): -
PV Installation Date (PV): Mon,Feb 02,2026
Sales Representative: Jeff Lum((808) 386-0183)
Project Engineer:
Electricians:
Technicians:Matthew Edboi(808-428-3790), Wesley Perbera, Ian Tsukiyama, Jesse Gomez(8083878316), Rodnick Agpalza
Pending Technical Review:
Accepted / Pending Permit Clousre:
Final Acceptance:
Customer Details
Customer Name: Marshall Ito
Street Address: 565 Paopua Lp
City: Kailua
Zip Code: 96734
1st/2nd Phone: home / (808) 554-9862
Email: han.sourou@gmail.com
Association: No
Neighborhood/Town: [WED] - Waimanalo - Kaneohe - Kailua - Kaawa - Laie
System Specifications
System Size:4.4 kW
System:
Storage Size:
14.0 kWh
[ No. ] Module Type:
[10]Hyundai 440NF Black
[ No. ] Inverter Type:
[1] Tesla 11.5 kWh
[ No. ] Storage Type:
[1]Tesla Powerwall 3 AC (14.0 kWh)
Deal Type:
NA
Num. of Floors:
 1
Long Ladder:
No
Roof Type:
Metal Roof - Standing Sea
Roof Attachments:
Conduit Run Type:
Under Eaves
Monitoring Type:
{monitoring_type}
Roof & Racking
Rafter Material: Wood
Rafter Distance: 2'
Electrical
Type of meter: ** Digital **
HECO ACCT/MTR No.: 201016053807
Electrician: 0
Service Size & Source: 200 / Overhead
Existing Subpanel?: None
Elec. Service upgrade?: n
Notes



JOB DETAILS
Job Installation Date February,02 2026
Customer Name Marshall Ito
Sales Consultant Name Jeff Lum
Geographical Location [WED] - Waimanalo - Kaneohe - Kailua - Kaawa - Laie
Address 565 Paopua Lp,Kailua, 96734
Roof Type Metal Roof - Standing Sea
System Size 4.4 kW
Assigned Technicians Matthew Edboi,Wesley Perbera,Ian Tsukiyama,Jesse Gomez,Rodnick Agpalza
Assigned Electriciaan
PARTS LIST Quantity Unit QTY pulled Addtl QTY pulled QTY returned
Hyundai 440NF Black 10 pcs
Tesla 11.5 kWh 1 pcs
Rapid Shutdown 4 pcs
Engineering 1 pcs
IronRidge Bonded L-Foot Black 14 20 pk
IronRidge UFO Module Clamp Black 20 20 pk
IronRidge UFO 46MM Stopper Black 10 20 pk
WEEB-6.7-1, assembled Ground Lug 5 pcs
Iron Ridge XR-100-204B XR100 Rail 204" Black (17') 84 pcs
Iron Ridge XR-100-SPLC XR 100 Splice Mill 2 ft
Iron Ridge XR-100-CAP XR100 End Cap 10 PC Kit 10 pcs
Iron Ridge RS-GDST-001 GROUND STRAP 2 pcs
S5 Clips 31 pcs
Ground Wire per foot 42 ft
Zip Ties Large 42 pcs
Zip Ties Small 30 pcs
Monier, Metal, Wood Shake or >24 panels 1 pcs
Total Roof Labor 10 labor
Roof Labor 10 labor
AEI Site Assesment 2 sub
Electrical Materials 1010 units
Electrician-Journeyman 66 labor
Electrician-Helper 50 labor
sticker 1
NEM+ Generation Panel 1
Hardwire 1
Permit Fee 381
Tesla Powerwall 3 AC (14.0 kWh) 1 pcs
Tesla PW2 AC (14.0 kW) & Gateway 1 pcs
Shipping 1 ea
Electric Material Storage 485 unit
Electrician-Journeyman 10 labour
Electrician-Helper 10 labour
ELECTRICAL PARTS & LABOR TOTAL 20 labour
Check or CC Price 1 1.03
Solar Insure Storage 1620
Solar Insure PV 440